The ongoing construction of the truck
The truck will be designed and built in 2021 and spring 2022 before being tested on the test track from the summer of 2022, and then tested in commercial operation in the summer of 2023. On this page you will be able to follow the ongoing work on the construction.
19 April, 2023
The truck has been tested
The truck with solar cells on the entire trailer has been tested on a test track for a long time.
28 April, 2022
Construction of electronics and electrical systems with batteries
CAD image of installation in the trailer to the right.
22 March, 2022
Installation of solar panels are now completed
16 March, 2022
Installation of solar panels
Installation of approx. 115 m2 solar panels on the roof and sides of the trailer.
3 March, 2021
Trailer on the way
Trailer with the first solar panels installed, on the way to operational testing.
25 February, 2021
Installation of solar panels
Pictures from the installation of the first solar panels on the trailer in Eksjö.
1 February, 2021
The trailer is ready
The trailer is now ready for use in the project. First we will mount a solar panel on each side, test that the installation works and test how big the solar energy production will be for a panel. This autumn, we will then install solar panels on the entire sides and roof of the trailer and install batteries in the trailer.