The ongoing construction of the truck

The truck will be designed and built in 2021 and spring 2022 before being tested on the test track from the summer of 2022, and then tested in commercial operation in the summer of 2023. On this page you will be able to follow the ongoing work on the construction.

19 April, 2023

The truck has been tested

The truck with solar cells on the entire trailer has been tested on a test track for a long time.

28 April, 2022

Construction of electronics and electrical systems with batteries

CAD image of installation in the trailer to the right.

22 March, 2022

Installation of solar panels are now completed

Solar cells on truck - now completed

16 March, 2022

Installation of solar panels

Installation of approx. 115 m2 solar panels on the roof and sides of the trailer. 

Solar panels on the entire trailer.Solar panels on the entire trailer.

3 March, 2021

Trailer on the way

Trailer with the first solar panels installed, on the way to operational testing. 

Trailer on the road

25 February, 2021

Installation of solar panels

Pictures from the installation of the first solar panels on the trailer in Eksjö.

The first solar panels on the trailer.The first solar panels on the trailer.

1 February, 2021

The trailer is ready

The trailer to be used.The trailer is now ready for use in the project. First we will mount a solar panel on each side, test that the installation works and test how big the solar energy production will be for a panel. This autumn, we will then install solar panels on the entire sides and roof of the trailer and install batteries in the trailer. 